Logo
Login | Register
Menu
  • President's Letter
  • Home
  • About Us
  • Join ORCA - Print Application
  • Pay or Renew Your Dues
  • Upcoming Events
  • Kayak & Canoe Racks
  • Marina & Boat Ramps
  • ORCA Beach Rules
  • Celebration Bricks at the Pavilion
  • ORCA Branded Merchandise
  • News Articles
  • Helpful Links
  • Contact Us
  • Lost and Found
  • Member Directory
  • Clubhouse & Pavilion Reservations
  • Documents and Forms
  • Photo Album
  •  

News Articles

Return to List
Friends of Green Hill Pond
Posted on Mar 22nd, 2019

We received the final report from URI on the impact of dredging the channel connecting Ninigret and Green Hill Pond (GHP) on the circulation and flushing of GHP. This study was initiated by FOGHP in 2017 and was funded by the State of Rhode Island and the Town of South Kingstown.
The study shows that dredging the channel connecting the two Ponds would be safe and beneficial but the overall impact on reducing bacteria in GHP is less than we had hoped. Although the simulations show a significant increase of water flowing into and out of GHP from channel enhancement, the net result is a relatively small overall reduction (8%) in mean fecal coliform bacteria levels throughout Green Hill Pond. A senior water resources engineer who reviewed the study stated that the bacteria reduction is likely to be highly uneven given the tidal flow and location of the channel. Specifically, there will likely be significantly more improvement than 8% occurring on the western side of the Pond (nearer the bridge) and and significantly less occurring on the eastern and northern side (where, unfortunately, most of the bacteria problem is located). Given these results, we think it will be unlikely to obtain the estimated $1 million in construction funding for channel enhancement strictly as a means of reducing bacteria levels. However, we are exploring whether it can fit within larger coastal RI projects that are either currently underway (e.g. CRMC’s shoreline adaptation) or out for proposal (e.g. NFWF’s resilient communities). We always considered channel enhancement to be only part of the solution and still think that is true. 
That said, this study serves to highlight the critical importance of reducing the bacteria and nutrient loadings before it gets into our Pond through effective stormwater runoff control and attenuation. Ultimate success at reducing bacteria on the eastern and northern sides of the Pond depends on source reduction. So, as planned, we will be submitting on January 24 a second-round proposal to the state to help fund a stormwater best management practice (BMP) siting survey of the Green Hill Pond watershed. If partial funding is approved, FOGHP will provide matching funds from our generous donors to get this project underway quickly using an outside environmental engineering firm. Future phases of this project will be to implement BMPs at those locations, similar to what is currently being done in the Narrow River watershed with funding from the Town of South Kingstown.
Projects will evolve and change as we learn more and state/federal priorities change. However, preserving and protecting Green Hill Pond remains our mission as always.  
Thank you for your ongoing support and encouragement.
All the best,
Dennis Bowman
President
Friends of Green Hill Pond.
Comments
Add Comment
Comment By: frederik degrooth
Posted on Jan 28, 2024

I would like to join the friends of Greenhill Pond, Please advise as how I would go about doing this my oh my God email address is Fdegrooth@atslab.com- phone 401-741-5684


© Copyright 2026 Ocean Ridge | Neighborhood Website by HOA Sites | Terms of Use | Admin